Bondo Gold Prospect ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Bondo Gold Prospect
ASSET TYPE
Development
Development METALS & MINERALS
Copper, Gold
DEPOSIT TYPE
ALLUVIAL
SPECIFIC LOCATION
Handeni, Tanzania
CURRENT ASSET STATUS
  • Debt Financing Negotiations
  • For sale - $3.00 M
  • Fully permitted
  • Mandate Letter
  • Mine construction suspended - energy availability
  • Mine construction suspended - strike/political event
  • Permitting
  • Revising costs
THE LARGEST
CANACO RESOURCES
ONE OF THE TOP
REFERENCE OR DISTRICT NAME
HANDENI
CURRENT ASSET STATUS NOTES

Looking for buyer

OWNERSHIP STRUCTURE
COMPANY NAMESTAKE %NOTES
Optioner GeoSERVE (T) Ltd 51
0
0
ASSET ACTIVITIES
ACTIVITYSTART DATEEND DATEPROGRESS
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Copper 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Copper 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Copper (m lbs) Produced762
00000000Gold (k oz) Produced792
00000000Copper (m lbs) Sold761
00000000Gold (k oz) Sold791
00000000Copper Recovery (%)764
00000000Gold Recovery (%)794
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRCopper (lbs)Gold (oz)
Date of Assessment
Jun 11, 2026